Plan
Date/ Time
|
Objective
|
Targets
|
Evaluate
|
22/11/18
9AM
Thursday
|
I will choose 3 artist that perform live and will go over some gear the use while performing
|
| I have managed to talk about 3 artists within the live performance and what kind of gear they use. I don't feel that I will need to continue this into next week as all had been researched. I have made blog within blogger. The reason to making it in blogger is because its the site if had most experience in using so I thought to go back to it an place all my information. |
23/11/18
9AM
Friday
|
Do research at the beginning of the day to finish off.
Research 3 roles within live performance
Will do a assessment of what will be required for my performance, i.e equipment, F.O.H, Ableton
|
| I have successfully completed a risk assessment of the type of hazards that can occur during the performance. I have research 3 roles within the live sound/ performance industry. I felt that I have done a good effort on some of the roles. I have also found some equipment that I'll be using and will need for the performance. |
27/11/18
11:30AM
Tuesday
|
Go over my research and correct any mistakes
Start risk assessment
Pick a genre for my ableton composition
|
| I have fully competed my risk assessment and all possible hazards within the public. Corrected any mistakes within my research I have started my composition in Ableton and will continue to develop it with feedback given. |
30/11/18
9AM
Friday
|
Finish off risk assessment
Pick my genre and start composition as well as practice anything in Ableton on clip launchers
Figure our Roles for the live performance |
| Fully completed risk assessment Finished composition and have to practice it for the final day. I have been assigned to be the mixing engineer. So I will be control of the amplitude and gain of the F.O.H and Fold back, and microphone. |
Comments
Post a Comment